[parameter] batch_sizes=2 learning_rate0=6e-4 learning_rate1=6e-3 iteration_times=5 discount_factor=0.8 d_k=100 forward_step=5 range_p=30 range_g=2 range_k=50 d_line=20 range_c=300 range_v=5000 range_e=0 [cost] beam0=70000 beam1=80000 bridge_pier=300000 tunnel0=72800 tunnel1=11800 tunnel2=132000 tunnel_entrance=390000 railway_tracks=9300 road_right_fee=75 filling_cost=36 excavation_cost=36 arable_land_occupation=95.1 house_demolition=10 farmland_layer_name=sensitive_area demolition_layer_name=sensitive_area replace_railway_by_bridge=0 [standard] design_speed=250 minimum_curve_radius=3500 minimum_circular_length=200 minimal_longitudinal_length=900 maximum_gradient=20 maximum_slope_difference=18 maximum_bridge_height=100 maximum_tunnel_length=12000 filling_height_lbb=10 digging_deep_ltb=15 minimum_transition_curve_length=120 minimum_clip_line_length=200 minimum_radius_of_convex_vertical_curve=20000 minimum_radius_of_concave_vertical_curve=20000 minimum_length_of_vertical_curve=25 [ecology] water_pollution=5 noise_and_vibration=10 cultural_heritage_protection=25 destruction_wildlife=20 original_natural=60 traffic_network=90 fields_woods=20 air_pollution=5 house_demolition=40